How We Build
The Way We Build
Casting a house using Fast Built System (FBS) is simple and cost efficient. With a rough foundation, you can now set up IBS formwork and cast in-place with lightweight concrete within a week as columns and beams are no longer needed.
FBS makes construction less labour-oriented, quicker completion with good quality control.
Click image to enlarge:
Approximately 10-day fitting duration including door, window frame setting, wiring conduit, piping and so on.